x
Black Bar Banner 1
x

NEW: About Me Look — turn on a full-width dark About Me from your profile Configuration (Profile Page Upgrade). The Academy, profile feeds and Media Feed now read like the News Feed. See Subscriptions »

New: AI Blog Autopilot — free for the next 30 days. Switch it on by November 15th »

NEW: Smart Mail is live — free for every member. Send broadcasts, build lists and run autoresponders. Open Smart Mail »

Training: Lesson 14 in Getting Started with MarketHive. Watch it now »

A+ A−
Ads by Markethive - View All
The Blog Feed
The Blog Feed
» Blog Feed
Write a New Blog Post
Search Blog Status
Most Viewed
Most Recent
Most Shared
Alphabetical
Markethive Blog (default)
My Blog Posts
Friends' Blogs
Blog Categories
All
Advertising
Blockchain & Cryptocurrency
Business Development
Diet & Weight Loss
Environmental
Health and Wellness
History and Culture
Home and Garden
Marketing
Mentoring & Training
Money & Finance
Other
Political
Prayer & Religion
Programming & Technical
Real Estate
Search Engine Optimization
Social Media
Spirituality
Sports & Recreation
Transport
Travel & Events
Website Design
Blogging Tools & Assets
My Blog Info
Members Subscribed to You
Blogs You Are Subscribed To
Website Widget
Wordpress Plugin
Subscribe for Greater Services
Subscribe to one of many subscriptions, each one includes the previous ones.. Unlock powerful tools, advance features, to build a powerful reach.

Ethereum's Glamsterdam Upgrade Delayed Over Security Vulnerabilities 🚨

Posted by Simon Keighley on October 27, 2026 - 7:51am


Ethereum’s Glamsterdam Upgrade Delayed Over Security Vulnerabilities 🚨

Ethereum's Glamsterdam Upgrade Delayed Over Security Vulnerabilities

Ethereum core developers have hit a major snag in their roadmap after postponing the long-awaited Glamsterdam upgrade on the Hoodi testnet. Originally scheduled for activation on 26 October 2026, the upgrade was abruptly called off following critical security warnings from blockchain researchers.

The sudden pause came after security audit firm ChainSecurity uncovered serious vulnerabilities in how proposed gas accounting changes interact with live smart contracts. With 13 real-world smart contracts already identified as vulnerable, the core engineering team chose to halt the rollout to prevent potential exploits on mainnet, as detailed in the latest CryptoSlate reporting on the delay.

 

Why Was the Hoodi Upgrade Cancelled?

The immediate catalyst for the postponement was a series of findings regarding two Ethereum Improvement Proposals: EIP-8037 and EIP-8038. EIP-8037 introduces a dedicated state-gas reservoir for contract creation, whilst EIP-8038 updates execution costs for accessing existing state.

While these proposals aim to align gas costs with actual node resource usage and increase transaction capacity, they inadvertently alter how gas is refunded and tracked during complex transactions.

Protocol Watch founder Christine Kim raised the alarm shortly before the formal announcement, notifying testnet operators on X to revert their nodes or install client builds that cancel the scheduled activation epoch.

The decision was formalised during All Core Developers Execution meeting #248 and subsequently confirmed in an official Ethereum Foundation post. Along with pausing the Glamsterdam activation, developers suspended a planned testnet gas limit increase to 200 million, which was meant to benchmark high-throughput scaling scenarios.

 

The Mechanism Behind the 13 Vulnerabilities

At the heart of the issue is a flaw that security analysts describe as a variation of "insufficient gas griefing".

In Ethereum's current execution model, smart contracts handling withdrawals, batched transactions, or fallback routines often check remaining gas ( gasleft() ) after calling an external contract. If the target contract runs out of gas, the caller detects the failure and gracefully reverts the entire transaction so a user can safely try again later.

However, Glamsterdam's new gas accounting rules introduce scenarios where spent gas unexpectedly refills during execution. Under EIP-8037, state creation charges draw from a separate reservoir. If an intermediary contract reverts or if a persistent storage slot is cleared, a last-in, first-out (LIFO) refill mechanism restores execution gas directly to the caller's balance.

This unexpected gas refill creates a dangerous side effect: a failure handler that previously would have run out of gas and reverted can now complete its execution. Consequently, an attacker can intentionally supply insufficient gas to force a subcall to fail, whilst the refilled gas allows the main contract to record the failure as permanent. This permanently blocks valid user operations and locks out retry mechanisms across decentralised finance applications.

ChainSecurity confirmed that its team had already identified 13 real-world contracts affected by this behaviour and initiated responsible disclosure procedures with the impacted projects.

 

Implications for the 2026 Ethereum Roadmap

This postponement represents another setback for Ethereum's ambitious 2026 development schedule. Glamsterdam was originally targeted for release during the first half of 2026 before slipping to December. Core developers had tentatively eyed activation dates of 1, 8, or 9 December, subject to smooth testing on Hoodi.

With the Hoodi testnet activation now indefinitely postponed, meeting a December mainnet launch appears increasingly unlikely. The delay also threatens to squeeze preparations for Hegotá, the next major network upgrade slated to follow Glamsterdam.

Glamsterdam remains a critical milestone for Layer 1 scaling, promising to introduce features such as enshrined proposer-builder separation and block-level access lists. However, developers have made it clear that preserving smart contract security and mainnet backward compatibility takes priority over meeting arbitrary deadlines.

 

What Node Operators and Developers Must Do

For node and validator operators currently running on the Hoodi testnet, action is required immediately:

  • Update Node Clients: Operators must upgrade both execution layer clients (such as Besu and Nethermind) and consensus layer clients (such as Lighthouse, Prysm, Teku, and Lodestar) to releases that explicitly remove the 26 October activation epoch.
  • Review Contract Logic: Smart contract developers are advised to audit failure-handling routines. Relying on post-call gas checks or assuming that subcall failures will force an overall transaction revert is no longer safe under proposed state-gas mechanics.

As the Ethereum Foundation investigates the extent of contract exposure, a revised Hoodi testnet timeline will be announced in due course. Mainnet users and ETH holders do not need to take any direct action at this stage, as existing chain history and mainnet security remain completely unaffected.


 

Disclaimer: This article is provided for informational purposes only, mistakes may be made, and it's not offered or intended to be used as legal, tax, investment, financial, or any other advice.

 

 

 

ecosystem for entrepreneurs